Payment Plan
Project Completion Date - December 2010
|
Back |
Block |
Area
(Sft) |
Rate
(Rs) |
15% at Booking
(Rs) |
10% at Agreement
(Rs) |
25% at Foundation
(Rs) |
25% at Roof Casting
(Rs) |
15% at Brick work & Wood work (Rs) |
10% at Possession
(Rs) |
Total
Amount
(Rs) |
A3
Type
3 BHK |
1160 |
1700/- |
2,95,800/- |
1,97,200/- |
4,93,000/- |
4,93,000/- |
2,95,800/- |
1,97,200/- |
19,72,000/- |
A2 Type
3 BHK |
1480 |
1700/- |
3,77,400/- |
2,51,600/- |
6,29,000/- |
6,29,500/- |
3,44,100/- |
2,51,600/- |
25,16,000/ |
A1 Type
3 BHK |
1310 |
1700/- |
3,34,050/- |
2,22,700/- |
5,56,750/- |
5,56,750/- |
3,34,050/- |
2,22,700/- |
22,27,000/- |
B1,2 Type
Deluxe
2 BHK |
980 |
1700/- |
2,49,900/- |
1,66,600/- |
4,16,500/- |
4,16,500/- |
2,49,900/- |
1,66,600/- |
16,66,000/- |
B3 Type
Economy
2 BHK |
980 |
1600/- |
2,35,200/- |
1,56,800/- |
3,92,200/- |
3,92,200/- |
2,35,200/- |
1,56,800/- |
15,68,000/- |
| B4,6,7 Type
2 BHK |
980 |
1650/- |
2,42,550/- |
1,61,700/- |
4,04,250/- |
4,04,250/- |
2,42,550/- |
1,61,700/- |
16,17,000/- |
C1,2,3 Type
1 BHK |
490 |
1600/- |
1,17,600/- |
78,400/- |
1,77,625/- |
1,77,625/- |
1,17,600/- |
78,400/- |
7,84,000/- |
D Type
2 BHK |
950 |
1650/- |
2,35,125/- |
1,56,750/- |
3,91,875/- |
3,91,875/- |
2,35,125/- |
1,56,750/- |
15,67,500/- |
D Type
3 BHK |
1500 |
1650/- |
3,71,250/- |
2,47,500/- |
6,18,750/- |
6,18,750/- |
3,71,250/- |
2,47,500/- |
24,75,000/- |
|
- For Parking Space - RS.90,000/-Extra.
- For Corner Flats - @2% Extra
- Housing Loans Upto 85% By - SBI, UBI, UCO BANK, HDFC, IDBI, AXIS BANK, CANARA BANK, PNB, LIC.
For Detail Contact : Shashi S. Samanta (A G M) 9437267925/9090067925/9937021793
|
STRUCTURE |
Pile Foundation |
ROOF |
R.C.C. Roof (4’ ½ “ thickness) |
WALL |
First class K.B. Bricks masonry in rich cement mortar (1:6) |
PLASTERING |
12mm/16mm thick C.P. in cement sand mortar (1:6) |
WALL FINISING |
External and internal wall with smooth finish plaster.
One coat of Cement wash with two coat of distemper. |
FLOORS |
MARBLE FLOORING |
TOILET |
Anti skating tile floor with 5’ dado of glaze tiles. |
KITCHEN |
Provision of green marble in platform & flooring, ceramic cladding upto 3’ above kitchen platform |
DOORS |
Wooden door frame (nonsal) with commercial flush doors |
WINDOWS |
Aluminum sliding window doors. |
ELECTRICALS |
Concealed wiring network axing sheathed copper wire with provisional required light and fun points independent meter. |
WATER SUPLLY |
External water supply by provision of common bore well and OHT |
PASSENGER LIFT |
Provision of Passenger lift for 6 persons |
|
DOORS |
Entrance door will be of solid teakwood with Sal Frame; internal door will be flush door with Sal Wood Frame |
KITCHEN |
Green marble platform with ceramic cladding upto 3’ height above the kitchen platform provision of stainless steel sink |
ELECTRICALS |
Modular switch system with A/C points & TV point to drawing room |
FLOORS |
Vetrified/Marble flooring as per customer choice |
WALL |
Provision of putty with emulsion roller painting of internal wall |
BATHROOM |
15 ltrs Geyser with mixture point at bathroom |
COMMUNITY CENTRE |
Community centre with A/C facility |
SECURITY SYSTEM |
Intercom security system |
GENERATOR |
Generator Backup for one light & one fan point for each flat |
|
|
|
|